loading

Manufacturers and construction service providers of non-stop pipeline hot tapping/plugging equipment.

TTCL Successfully Completes DN200 Double Plugging Operation for Natural Gas Pipeline Maintenance

Taitat Changlin Pipeline Technology (Jiangxi) Co., Ltd. (TTCL) has successfully completed a DN200 cylindrical double plugging operation, providing a safe and efficient solution for maintenance work on an operating natural gas pipeline.

During this project, TTCL applied its advanced line stopping technology to perform a DN200 double plugging operation under live pipeline conditions. The pipeline was designed for a pressure of 1.6 MPa, with an actual operating pressure of 0.8 MPa, and the transported medium was natural gas.

The successful completion of this operation demonstrates TTCL’s professional capabilities in pressurized natural gas pipeline maintenance. Through precise engineering design, reliable plugging equipment, and strict operational procedures, the project was completed safely while maintaining continuous gas supply and minimizing the impact on downstream users.

TTCL’s cylindrical double plugging system provides an effective solution for pipeline isolation, allowing operators to safely carry out pipeline modification, valve replacement, maintenance, and emergency repair activities without shutting down the entire pipeline system.

With extensive experience in hot tapping and line stopping technology, TTCL provides comprehensive pipeline maintenance solutions for natural gas, water, oil, and industrial pipeline networks. The successful completion of this DN200 double plugging project further highlights TTCL’s expertise in ensuring safe, efficient, and uninterrupted pipeline operations.


For more than 40 years, TTCL has been dedicated to the research, development, manufacturing, and application of hot tapping machines, line stopping equipment, PE pipeline tools, and pipeline repair solutions. TTCL continues to support global customers with innovative technologies and reliable services.

759f3c9bea1c711c604d85e594c75513
759f3c9bea1c711c604d85e594c75513
43309343c18c9a7d216ddf0f4bd789af
43309343c18c9a7d216ddf0f4bd789af
06417a080671acc38556c70789728109
06417a080671acc38556c70789728109
98f3d75ab2e8a54fde0af5a19daa1c11
98f3d75ab2e8a54fde0af5a19daa1c11
91abd01f67dc913a703b90f848367e6b
91abd01f67dc913a703b90f848367e6b
4fa0f004824a90ba75e932a30ece0425
4fa0f004824a90ba75e932a30ece0425
prev
TTCL Successfully Completes PE315 Single Plugging Operation for Natural Gas Pipeline Maintenance
recommended for you
Get in touch with us

Taitat Changlin Pipeline Technology (Jiangxi) Co., Ltd.

For over 40 years, we have provided safe, efficient and proven solutions for pressure pipeline systems around the world, ensuring the safe flow of energy.
Contact with us
WhatsApp: +86 13570819716
Add: NO.1208 Saiwei Avenue, EDZ, Xinyu City Jiangxi Province, China.


Copyright © 2026 Taitat Changlin | Sitemap  |  Privacy Policy
Customer service
detect