loading

Manufacturers and construction service providers of non-stop pipeline hot tapping/plugging equipment.

Successful Completion of DN100 Hot Tapping & Single-Seal Line Stopping Project for Foshan Gas

We are pleased to announce the successful completion of a DN100 hot tapping and single-seal line stopping project for Foshan Gas.

The project was carried out on a natural gas pipeline with a design pressure of 1.6 MPa and an operating pressure of 0.8 MPa. Our technical team successfully completed the hot tapping and line stopping operation on the pressurized pipeline, providing an efficient solution for pipeline modification and maintenance without interrupting the gas supply.

Project Specifications

  • Pipeline Size: DN100
  • Pipeline Medium: Natural Gas
  • Design Pressure: 1.6 MPa
  • Operating Pressure: 0.8 MPa
  • Hot Tapping: DN100 pipeline
  • Line Stopping: Single-Seal Line Stopping
  • Project Status: Successfully Completed

The successful hot tapping operation allowed the pipeline modification work to be carried out while the natural gas pipeline remained in service. Following the hot tapping process, the single-seal line stopping operation was completed successfully, demonstrating the reliability of the equipment and the technical team's field experience in working with pressurized natural gas pipelines.

Hot tapping and line stopping are widely used for pipeline maintenance, modification, connection, replacement, and repair, helping pipeline operators reduce downtime and maintain continuous operation.

This successful project for Foshan Gas further demonstrates our capabilities in hot tapping and line stopping technology for natural gas pipelines and our ability to provide reliable pipeline solutions for demanding field applications.

Hot Tapping. Line Stopping. Zero Downtime Pipeline Solutions.

prev
TTCL Successfully Completes DN200 Double Plugging Operation for Natural Gas Pipeline Maintenance
DN80 Hot Tapping Project Successfully Completed by TTCL
next
recommended for you
Get in touch with us

Taitat Changlin Pipeline Technology (Jiangxi) Co., Ltd.

For over 40 years, we have provided safe, efficient and proven solutions for pressure pipeline systems around the world, ensuring the safe flow of energy.
Contact with us
WhatsApp: +86 13570819716
Add: NO.1208 Saiwei Avenue, EDZ, Xinyu City Jiangxi Province, China.


Copyright © 2026 Taitat Changlin | Sitemap  |  Privacy Policy
Customer service
detect