Manufacturers and construction service providers of non-stop pipeline hot tapping/plugging equipment.
Taitat Changlin Pipeline Technology (Jiangxi) Co., Ltd. (TTCL) has successfully completed an DN80 hot tapping project on a natural gas pipeline.
The pipeline was designed for a pressure of 1.6 MPa, with an operating pressure of 0.8 MPa. The pipeline medium was natural gas.
During the project, TTCL carried out the hot tapping operation under controlled operating conditions, enabling a new branch connection to be installed on the existing pipeline without interrupting the gas supply.
The successful completion of this hot tapping project demonstrates TTCL's capabilities in pipeline hot tapping and live-line intervention. By using hot tapping technology, pipeline operators can make new connections while keeping the existing pipeline in service, helping reduce operational interruptions and improve project efficiency.
TTCL has extensive experience in hot tapping, line stopping, and pipeline intervention, providing hot tapping equipment and engineering services for gas, oil, water, and other pipeline applications.
Pipeline Size: DN80
Design Pressure: 1.6 MPa
Operating Pressure: 0.8 MPa
Pipeline Medium: Natural Gas
Application: Hot Tapping / Pipeline Branch Connection
Status: Successfully Completed
With professional hot tapping equipment, engineering expertise, and field experience, TTCL continues to provide reliable hot tapping solutions for pipeline operators and contractors worldwide.