We are pleased to announce the successful completion of a DN200 cylindrical double line stop project in Guangzhou.

The pipeline design pressure is 1.6 MPa, with an actual operating pressure of 0.35 MPa. The entire operation was executed using advanced Hot Tapping and line stopping techniques, ensuring safe intervention without shutdown or service interruption.


Project Overview

  • Pipe Size: DN200

  • Line Stop Type: Cylindrical Double Seal (Double Line Stop)

  • Design Pressure: 1.6 MPa

  • Operating Pressure: 0.35 MPa

  • Method Applied: Hot Tapping + Double Line Stop Installation

The objective of this project was to isolate a section of the pipeline for modification while maintaining continuous operation. By utilizing Hot Tapping technology, we successfully performed live pipeline intervention under pressure, followed by the installation of a double line stop system to achieve secure isolation.


Application of Hot Tapping Technology

Hot Tapping played a critical role in this project by enabling:

  • Zero downtime execution — No shutdown required

  • Continuous pipeline operation during construction

  • Controlled and safe pressurized drilling

  • Precise alignment and cutting accuracy for DN200 pipeline

The Hot Tapping machine ensured stable cutting under the 0.35 MPa working pressure, while maintaining full system integrity throughout the drilling process.


Double Line Stop for Maximum Safety

Following the Hot Tapping operation, a cylindrical double line stop system was installed. The double sealing structure provides enhanced safety redundancy and reliable isolation performance.

Key advantages include:

  • Dual sealing mechanism for increased operational safety

  • Stable performance under designed pressure conditions

  • Effective sealing integrity during pipeline intervention

  • Suitable for repeated industrial maintenance operations

The combination of Hot Tapping and double line stop technology ensured that no leakage occurred and that pipeline service remained uninterrupted during the entire procedure.


Project Significance

This successful DN200 Hot Tapping and double line stop execution once again demonstrates our technical capability in live pipeline intervention under pressure. The project validates the reliability, sealing performance, and operational stability of our equipment under real working conditions.

We remain committed to delivering professional Hot Tapping and line stopping solutions that ensure safety, efficiency, and zero downtime for pipeline operators worldwide


930c009f75ae000ed9ad74056013d0f7
930c009f75ae000ed9ad74056013d0f7
ad0176828dfbd77bfa6d2c1cfa7b7bc7 (2)
ad0176828dfbd77bfa6d2c1cfa7b7bc7 (2)
6bcf0e8a5a01a0c5655ed7afdf6295d5 (3)
6bcf0e8a5a01a0c5655ed7afdf6295d5 (3)
54e90b7a290b9ef2d084e11987ce3192
54e90b7a290b9ef2d084e11987ce3192
888329fe954ab170d491f63489dcc93c (2)
888329fe954ab170d491f63489dcc93c (2)
afd3a6f09b75428117f7b38c27e6c1d7
afd3a6f09b75428117f7b38c27e6c1d7
prev
Guangzhou DN200 cylindrical double-seal project successfully completed
DN200 Double Line Stop Project Successfully Completed for Nanchang Gas
next
recommended for you
no data
Get in touch with us

Taitat Changlin Pipeline Technology (Jiangxi) Co., Ltd.

For over 40 years, we have provided safe, efficient and proven solutions for pressure pipeline systems around the world, ensuring the safe flow of energy.
Contact with us
WhatsApp: +86 13570819716
Add: NO.1208 Saiwei Avenue, EDZ, Xinyu City Jiangxi Province, China.


Copyright © 2026 Taitat Changlin | Sitemap  |  Privacy Policy
Customer service
detect